MN

Production flow, unified.

Production, warehouse and product data in one flow.

  1. 01
    Production management

    Manage production processes in one system.

  2. 02
    Warehouse management

    Connect and track inventory in real time.

  3. 03
    Product management

    Keep product data organized.

One system · Many possibilities

One product. Three connected stages.

Connects production, warehouse and product data in one integrated flow, so teams work in closer sync.

Your ERP · External systemsWe are developing integrations with the systems you already use.

One card's journey

One card, from order to warehouse.

Scroll down and follow card F202609000004. At each stage, the screen shows what MES and WMS record.

01 / 05 · MES

The order is split into cards

Order ORD-24-101 creates a card of 10 pcs. The barcode label is printed and travels with the products.

02 / 05 · MES

From the Knitting dept, by transfer note

Knitted from 2/26 yarn on 12G gauge, then moved to the Sewing dept on transfer note P20260900002. Quantity and weight are checked on receipt.

03 / 05 · MES

Sewing is recorded card by card

Workers scan their card to report the operations they completed. Pay is calculated automatically per card.

04 / 05 · MES

The check splits the card

A "dropped stitch" nonconformity is found on 2 pcs. The card is split into 8 + 2, and the 2 pcs move to rejects.

05 / 05 · WMS

Stored in the warehouse by RFID

The 8 pcs that passed are handed over to the warehouse. WMS prints an RFID chip for each product, boxes them and places them in a shelf bin.

F202609000004
Location
Order · ORD-24-101
Quantity
10 pcs
Status
Label printed
Order — MES screen
Knitting — MES screen
Sewing — MES screen
Quality check — MES screen
Warehouse — WMS screen

Try it yourself

Scan the card and follow along.

Each click moves card F202609000004 to the next department. Location, quantity and status update just as they would in the system.

  1. 01OrderMES
  2. 02KnittingMES
  3. 03SewingMES
  4. 04Quality checkMES
  5. 05WarehouseWMS

MESThe order is split into cards

Order ORD-24-101 creates a card of 10 pcs. The barcode label is printed and travels with the products.

  1. 01Order · Label printed · 10 pcs

Savings calculator

How many hours a month go into manual records?

Enter your own numbers to compare time spent on manual entry versus card scanning. The values in the fields are only examples — the formula is shown below.

Hours saved per month

0h

0 working days (8 h)

Formula and assumptions

Manual = cards × stages × minutes ÷ 60 + workers × pay calculation minutes ÷ 60

Card = cards × stages × seconds ÷ 3600 + workers × pay check minutes ÷ 60

Savings = Manual − Card

  • Only recording time is compared. Time for fixing errors, stocktakes and preparing reports is not included.
  • This is an estimate based on the numbers you entered, not a guaranteed result.

How to start

Four steps from demo to roll-out.

Timeline and pricing are agreed together, based on the scope of your plant.

  1. 01Get to know it

    Try the demo yourself, then we talk through the needs of your production floor and warehouse.

  2. 02Baseline

    We measure today’s performance: pieces per labour hour, rejects and time spent on record-keeping.

  3. 03Set-up and pilot

    Data model, routes, units, permissions and integrations are configured and piloted in one area.

  4. 04Training and roll-out

    Users are trained and go live. A follow-up measurement compares the results with the baseline.

Check it before you decide

We do not promise a productivity figure up front — baseline and follow-up measurements confirm it.

© 2026 EMG suite · MMU LLC